Comparison of symptoms, chemistry, and nerve function to assess adequacy of hemodialysis

Dyck, P.J.; Johnson, W.J.; Lambert, E.H.; O'Brien, P.C.; Daube, J.R.; Oviatt, K.F.

Neurology 29(10): 1361-1368

1979


ISSN/ISBN: 0028-3878
PMID: 573380
Document Number: 153051
To determine whether symptoms of uremia, serum urea, serum creatinine or nerve function tests provided the most sensitive and reliable index on which to judge the need for hemodialysis, 22 patients were placed in a controlled clinical trial of short or long hemodialysis thrice weekly. Short hemodialysis consisted of 1 1/2 h for women and 2 h for men, whereas long dialysis consisted of 3 h for women and 4 h for men. Nerve function tests included scored neurologic disability, muscle strength, computerized tests of cutaneous sensation and nerve conduction studies. Of 9 patients in the short hemodialysis group, three remained free of symptoms of uremia, pericarditis developed in two, pleurisy occurred in one and ascites developed in another. Only three could be maintained on the schedule for the full 12 mo. of the study. All 13 patients in the long hemodialysis group remained free of such symptoms and signs, and could be maintained on the schedule for the full study. Despite the difference in duration of dialysis and the clinical response, predialysis urea and creatinine values and tests of nerve function did not provide a clear index of need for dialysis. Even in 3 patients with unequivocal symptoms of uremia, serial tests failed to show worsening of nerve function. Predialysis urea and creatinine values and tests of peripheral nerve function do not appear to be sensitive or reliable indices by which the practicing nephrologist can adjust the amount of hemodialysis from day to day. Although tests of nerve function might indicate a need for more hemodialysis when inadequate hemodialysis has been extended for long periods, significant differences were not detected in scored neurologic findings between the 2 hemodialysis treatment schedules when results were projected to the end of a year.

Document emailed within 1 workday
Secure & encrypted payments