Subsurface-flow constructed wetlands treatment in the plains: five years of experience

Dahab, M.F.; Surampalli, R.Y.

Water science and technology a journal of the International Association on Water Pollution Research 44(11-12): 375-380

2001


ISSN/ISBN: 0273-1223
PMID: 11804121
Document Number: 526772
This paper documents the performance of a subsurface-flow constructed wetlands system during its initial five years of operation under variable loading and operating conditions associated with a northern midwestern US climate. The results indicate that effective and sufficient CW seasonal removals of TSS, VSS, CBOD5, COD, and fecal coliform were achieved. Wastewater temperatures seemed to affect CBOD5 and COD removal rates. Nitrogen and phosphorus reductions were not as effective and varied seasonally, as well as with wastewater temperature. The addition of a sand filter, to aid in further nitrification and disinfection following CW treatment, markedly improved the performance of the wetlands system. After a few years of operation, the remarkable performance of the CW system was dampened by apparent clogging and subsequent eruption of wastewater at the head-end of the treatment cells. While clogging was partially caused by biomass build-up in the wetlands substrate, visual observations suggest that excessive vegetation coupled with relaxed maintenance may also be responsible for clogging.

Document emailed within 1 workday
Secure & encrypted payments